Chester County Hospital

Project Type: Health Care

Service: Advanced Coordination / Prefabrication Enabling

Client: Penn Medicine

Stats: 250,000 sf / $300 million / Year: 2020

**Work performed during employment at StructureTone

250,000 sf hospital expansion and 25,000 SF of renovation containing Emergency Department, operating rooms for cardiac catheterization, hybrid ORs, as well as 99 patient beds.

Prefix (then known as ACT) was part of the General Contractor’s team as the coordinator.

Image by Chester County Hospital

 

Advanced Coordination

Prefix performed pre-coordination on this project, modeling the MEP scope during the design phase.

Immediately after buyout, subcontractors validated coordination and re-issued for signoff.

With Prefix’s guidance, cold joints were located in mechanical spaces to reduce hot work performed on-site, increasing safety and efficiency during construction.

As a result the mechanical room was 100% fabricated prior to the pour of slab.

Previous
Previous

Modern Theatre

Next
Next

Laboratory for Integrated Science and Engineering